Weighted score 76.3. Evidence coverage 83%. Two rules sit above this arithmetic: over 8% material variance or an open critical NCR forces Contradicted; under 30% evidence forces Unobserved regardless of how good the numbers look.
BOQ items on this floor
Item
Planned
Measured
Certified
Verdict
BOQ 4.2
RCC M25 in slabs, beams & landings incl. shuttering and finishing
72
52
50
Supported
BOQ 5.1
Brickwork 230mm thick in CM 1:6 with second class red bricks
68
52
50
Supported
BOQ 6.4
12mm cement plaster in CM 1:4 to internal walls
319
223
216
Supported
BOQ 8.3
Vitrified tile flooring 600×600 laid on 20mm CM 1:4 bed
287
206
199
Supported
BOQ 9.1
APP membrane waterproofing to toilets and terrace incl. screed
318
239
231
Supported
Material reconciliation — theoretical vs actual
Material
Theoretical
Actual
Variance
At risk
OPC 53 cement
store issue register · 2 slips
94.33 bag
98.2 bag
+4.1%
₹1,583
TMT Fe550
store issue register · 3 slips
2.88 T
2.93 T
+1.9%
₹2,920
M-sand
store issue register · 11 slips
26.2 T
26.88 T
+2.6%
₹775
20mm aggregate
store issue register · 11 slips
34.09 T
35.28 T
+3.5%
₹1,166
Red brick
store issue register · 4 slips
3,150.09 no
3,247.74 no
+3.1%
₹869
Anything above 8% is Contradicted. Cement does not evaporate — it walks out of the gate.